News
Batch delivery of dozens of ring testing boxes to Xinwangda (Lanxi) production base in August 2021
TOPS Date:2024-12-17

In August 2021, a batch of double-layer high and low temperature alternating humidity test chambers, double-layer high and low temperature test chambers, high and low temperature low-pressure test chambers, and cold and hot shock test chambers will be delivered to the Xinwangda (Lanxi) production base. Thank you again for the trust and support given to Dingzhun TOPS by our loyal customers. Dingzhun will continue to provide high-quality testing equipment and excellent after-sales service to help our customers achieve faster and better sustainable development.

image.png

The Xinwangda Zhejiang Liwei Lithium ion Battery Project has a total investment of 5.2 billion yuan and is currently the largest single investment new energy and smart manufacturing project in Lanxi. The first phase covers an area of 315 acres with a planned construction area of 400000 square meters. The project has introduced domestically leading fully automated and intelligent lithium-ion battery cell production lines and battery module production lines. After reaching full production capacity, it can produce 240 million lithium-ion batteries and 240 million lithium-ion battery modules annually, with an annual output value exceeding 10 billion yuan.



image.png

Recommended News

Tel: 86-755-26478771
Email: jon.zhang@sztops.cn
Web site: http://www.sztops.cn
Address: Building A, No. 222 Xiangshan Avenue, Luotian Community, Yanluo Street, Bao'an District, Shenzhen
Copyright © 2024 Shenzhen Dingzhun Electronics Co., Ltd. All rights reserved. Powered by EyouCms 粤ICP备15102210号